AlanW
Maximum Pace
- Jan 30, 2007
- 1,215
- 440
I will be riding a route from Hiratsuka to Odawara via a couple of passes tomorrow.
Early start and early finish! Start at 7:20am from JR Hiratsuka north exit. Rapid pace and minimal breaks (and brakes) over Ashigara Toge, down to Gotemba, over Nagao Toge, along the shore of Ashinoko and back to Odawara. If time and traffic allows, can extend the route back to Hiratsuka.
Speedy gentlemen are welcome to join. I have to finish early so can wait a bit at the tops, but not long. Alternatively, you can drop me! Let me know if you're interested.
AW.
Early start and early finish! Start at 7:20am from JR Hiratsuka north exit. Rapid pace and minimal breaks (and brakes) over Ashigara Toge, down to Gotemba, over Nagao Toge, along the shore of Ashinoko and back to Odawara. If time and traffic allows, can extend the route back to Hiratsuka.
Speedy gentlemen are welcome to join. I have to finish early so can wait a bit at the tops, but not long. Alternatively, you can drop me! Let me know if you're interested.
AW.