Yamabushi
Maximum Pace
- Jun 1, 2010
- 2,335
- 188
Another base building ride, this time with a series of rollers for the second half of the ride. We'll start up the Arakawa as usual, but then arc down the front of the mountains ending in Takao. It's a nice scenic ride with a minimum of traffic or congestion!
INFO:
Meet Time: 8:00am
Meet Place: Family Mart (HERE)
Climbing: 1200-1600m
Distance: 115-125km
Route: HERE
This will be a modest paced ride with conbini stops as needed. Hope to see you Saturday morning!
INFO:
Meet Time: 8:00am
Meet Place: Family Mart (HERE)
Climbing: 1200-1600m
Distance: 115-125km
Route: HERE
This will be a modest paced ride with conbini stops as needed. Hope to see you Saturday morning!