AlanW
Maximum Pace
- Jan 30, 2007
- 1,215
- 440
Travis has delegated the KT series of training rides to me in preparation for the Kusatsu Hillclimb coming up in April.
KT 3 will be on this Sunday due to rain forecast for Saturday. The route is from Musashi-Itsukaiichi station, going south then west over Wadatoge (up the steep side and down the gentle side); from there we will head north towards Tomi-no-mori, and down to Okutama-ko. We will follow the shore of the lake and the Tama river before one final hill climb which will lead us back to the starting point.
Here is the route map and elevation
http://www.mapmyride.com/route/jp/tokyo/852133590444
This route is designed to be a bit tougher than last week's KT2, and includes a long climbing section up to Tomi-no-mori to emulate the race.
Start time will be 9:15am from Musashi-Itsukaiichi.
I will post my plan for the rest of the KT rides in a couple of days time.
AW.
KT 3 will be on this Sunday due to rain forecast for Saturday. The route is from Musashi-Itsukaiichi station, going south then west over Wadatoge (up the steep side and down the gentle side); from there we will head north towards Tomi-no-mori, and down to Okutama-ko. We will follow the shore of the lake and the Tama river before one final hill climb which will lead us back to the starting point.
Here is the route map and elevation
http://www.mapmyride.com/route/jp/tokyo/852133590444
This route is designed to be a bit tougher than last week's KT2, and includes a long climbing section up to Tomi-no-mori to emulate the race.
Start time will be 9:15am from Musashi-Itsukaiichi.
I will post my plan for the rest of the KT rides in a couple of days time.
AW.